Your Position: Home > Projects > Corollary Equipment of Asphalt Plant > 8-10TPH Containerized Bag Bitumen Melting Plant Successfully Put into Operation in Vietnam

8-10TPH Containerized Bag Bitumen Melting Plant Successfully Put into Operation in Vietnam

Release Time: 2023-06-29
Read: 238
Share:

Introduction: Solving Vietnam’s Cross-Border Bitumen Equipment Dilemma

With the continuous expansion of Southeast Asia’s infrastructure industry, Vietnam’s road maintenance, municipal highway and pavement renovation projects are increasing year by year, and bag bitumen melting machine has become an indispensable core supporting equipment in the local asphalt construction system. However, traditional bitumen melting equipment generally has industry pain points such as non-standard size, high cost of ocean shipping, inconvenient site transfer, low thermal efficiency and excessive construction pollution, which restrict the construction efficiency and comprehensive economic benefit of Vietnam engineering enterprises for a long time. In order to accurately solve the core demands of overseas customers for cross-border logistics, site iteration and continuous production, ZOOMLINE successfully completed the customization and landing of ZAM-8 type 8-10TPH bitumen melting machine for jumbo bag by virtue of years of experience in asphalt complete equipment research and development and overseas project landing. The equipment was officially put into stable operation in Vietnam in June 2023. The equipment has stable production capacity and strong adaptability, and can provide lightweight, transportable, low-cost and standardized professional melting solutions for overseas asphalt construction in Southeast Asia.

Project Areas Vietnam
Production time June 2023
equipment products 8-10 ton/hour Bagged bitumen melter
Unit type ZAM-8
Equipment color matching black-orange colour scheme

8-10TPH Containerized Bag Bitumen Melting Plant

What Problems Did Vietnamese Bitumen Contractors Face?

The Vietnam customers of this cooperation have been deeply engaged in local municipal infrastructure and road engineering for many years. In the process of long-term application of traditional bagged Bitumen melting machine, they face many common problems in the industry, mainly focusing on four core dimensions: cross-border logistics, equipment operation and maintenance, capacity output and on-site construction:

High Transoceanic Logistics Cost

The traditional bagged bitumen melting machine  has no standardized shape size planning, the overall structure is messy, the space occupation rate is large, and it cannot adapt to the international general 40-foot high container loading standard. Equipment going to sea can only be transported in bulk or loaded in excess containers, which greatly increases cross-border logistics expenses and directly drives up the overall operating costs of enterprise equipment procurement and projects.

Poor Mobility & Secondary Utilization Difficulty

The upper lifting supports of conventional bitumen melting systems on the market mostly adopt an integral welding and fixing process, and the structure is integrated and cannot be disassembled. In view of the industry characteristics of scattered construction sites, multi-point rotation construction and cross-regional operation in Vietnam, it is difficult to disassemble and transfer equipment after completion, and it can only be stored idle in situ. The utilization rate of fixed assets is extremely low, resulting in serious waste of equipment resources.

Unstable Melting Efficiency

The old bitumen bag decanter has extensive heating mode, low heat conduction efficiency, slow melting speed, uneven heating of asphalt, incomplete melting and other problems, and cannot continuously output liquid bitumen with constant temperature and standard, which is difficult to meet the needs of large-scale and continuous road construction, which is easy to lead to project period lag and construction quality substandard.

Labor & Environmental Pressure

Traditional high-capacity jumbo bag bitumen melting machine equipment operation process is complicated, requiring a large number of manual auxiliary operations, with high labor intensity and high labor cost; meanwhile, the sealing structure of equipment is imperfect, asphalt volatilization and material leakage occur frequently, which not only causes raw material loss, but also fails to meet the environmental protection specifications of local green construction in Vietnam, resulting in clear compliance risks.

Clear Client Demand & Project Selection Criteria

In combination with the pain points of on-site construction and the long-term development planning of the enterprise, the Vietnam customer has formulated clear and bitumen melting equipment selection standards to achieve accurate correspondence between pain points and requirements, providing core basis for equipment customization and upgrading:

Stable Production Capacity Demand

In order to adapt to batch and continuous road construction scenarios, customers require that the equipment can maintain a melting capacity of 8-10 tons/hour for a long time, ensure the continuous supply of asphalt raw materials, and completely avoid the problem of delay caused by capacity gap.

International Transportation Demand

In order to reduce the comprehensive cost of cross-border logistics, the customer clearly requires the overall size of the decanter bitumen melting systems equipment to strictly align with the international standard of 40HQ high container, support the direct assembly of standard containers to sea, and minimize the cost of ocean transportation without customizing special transportation schemes.

Flexible Migration Demand

In view of the industrial characteristics of multi-project and cross-regional construction in Vietnam, customers require that the equipment has the structural advantages of rapid disassembly and convenient assembly. The lifting support can be disassembled and reassembled flexibly to meet the use requirements of multiple transitions and repeated reuse, and effectively improve the return rate of equipment assets.

High-efficiency & Eco-friendly Demand

Priority shall be given to the selection of new asphalt debagging equipment with high heat efficiency, low energy consumption and low pollution, simplifying manual operation process, reducing operation and maintenance cost, conforming to local environmental protection construction standards of Vietnam at the same time, and realizing two-way unification of efficient production, cost reduction and efficiency improvement and compliance operation.

ZOOMLINE Targeted Solutions: 40HQ Container & Detachable Bolted Bracket Design

Deeply conforming to all construction pain points and customization requirements of Vietnam customers, ZOOMLINE breaks through the design limitations of traditional bitumen melting machine for bagged bitumen, structurally optimizes and upgrades ZAM-8 bag bitumen melting machine asphalt decanter, creates customized solutions dedicated to Southeast Asian ocean transportation and flexible operation at multiple construction sites, and leads the industry with core differentiation advantages:

40HQ Container Standard Overall Dimension Design

The overall size of ZAM-8 bitumen bag melter landed in Vietnam has been accurately measured and optimized, which fully conforms to the international 40-foot high container loading specification. The equipment layout is regular and the space utilization rate is maximized. It can directly realize standard container assembly to sea, solve the pain points of difficult sea transportation, high freight and long transportation cycle of traditional non-standard equipment from the root cause, and greatly reduce the cross-border logistics cost of customers.

bitumen melting machine for jumbo bag

Fully Bolted Detachable Upper Lifting Bracket

All lifting supports on the upper part of asphalt melting bag removal equipment abandon traditional integrated welding technology, and all adopt modular fixed connection with high strength bolts to support rapid disassembly and convenient reorganization without professional equipment and complex construction procedures. The detachable structure accurately adapts to the geographical characteristics of scattered construction sites and frequent cross-site construction in Vietnam, perfectly adapts to ocean cross-border transportation and multi-project recycling scenarios, and thoroughly solves the industrial problems of poor mobility and idle waste of traditional equipment.

High-efficiency Heating System Solution

The bitumen decanter machine is equipped with an efficient closed-loop heat transfer oil heating system, equipped with an intensive heating pipeline, and adopts a segmented precision temperature control melting process.

Firstly, the solid bagged asphalt is uniformly preheated and melted, and then the temperature is raised at constant temperature for the second time through the strengthened pipeline, so as to ensure that the asphalt quickly meets the standard, stable pumping, accurate temperature control in the whole process, uniform heating, high melting efficiency, uniform and stable quality of finished asphalt, and fully meet the continuous and large-scale construction requirements.

Optimized Operation & Environmental Protection Design

The bag bitumen melting machine optimizes the operation logic of the whole machine, simplifies redundant manual process, greatly reduces operation intensity and labor input; with the fully enclosed heating chamber structure, effectively suppresses asphalt volatilization and material leakage, reduces raw material loss and site pollution, fully conforms to the local environmental protection construction specifications of Vietnam, and realizes all-round energization of energy saving, cost reduction, efficient production and green construction.

Working Principle & Complete Technical Specifications of Bag Bitumen Melting Machine

ZOOMLINE ZAM-8 bitumen melting machine for jumbo bag is a special melting equipment specially developed for bagged bitumen liquid conversion scenario. With two core advantages of 40HQ container adaptation size and detachable bolt structure, it is highly suitable for overseas cross-border construction scenarios. The equipment has mature working principle and stable and reliable technical parameters.

Working Principlet: Bagged bitumen melter takes efficient heat transfer oil circulation system as core heat source, realizes stable temperature rise through closed-loop constant temperature heating, firstly fully melts and softens solid block bagged asphalt, and then strengthens temperature rise by relying on high-density heating pipeline of fuselage, so as to make asphalt quickly reach construction standard pumping temperature, and finally stably transports qualified liquid asphalt to storage tank. The overall thermal efficiency of the equipment is high, the melting speed is fast, and the temperature control accuracy is high, which can effectively reduce the labor cost and construction pollution, and ensure the continuous, efficient and stable asphalt supply on the construction site.

Core technical parameters:

Project Parameter
Unit type ZAM-8
Bitumen smelting capacity 8-10 tons/hour
Bsphalt conveying capacity 30m³/h
Lifting parameters Maximum lifting capacity: 2 tons; maximum lifting height: 3 meters
Heating power 350kw*2+100kw*1

Project implementation and one-stop service guarantee

This Vietnam bitumen melting machine project relies on ZOOMLINE’s mature and perfect overseas project landing system to realize the closed-loop exclusive service of the whole process from demand docking, scheme customization, precision production to production operation:

The technical team combines the customer’s ocean transportation needs and the characteristics of multi-site construction, completes the equipment size optimization and modular detachable structure customization, and accurately matches the overseas construction scenario;

Precision manufacturing technology is adopted in the production stage, and multiple rounds of performance debugging, load trial operation and quality inspection are completed before delivery to ensure that the equipment adapts to the tropical and high temperature construction environment of Vietnam and operates stably and durably;

In the shipping stage, relying on the standardized overall design of 40HQ, the whole cabinet packaging and orderly loading of equipment are realized, so as to ensure the safety of ocean transportation and reduce the logistics cycle to the maximum extent.

After the equipment arrives at the port, the company’s professional overseas technical team will follow up the whole process, providing one-stop landing services such as standardized installation, precise commissioning, equipment operation and maintenance, operator training, etc., to help customers quickly complete the equipment landing and production.

The full-link, professional and standardized overseas service system completely solves the core pain points of overseas customer equipment landing difficulty, operation and maintenance insecurity and unprofessional operation.

On-Site Operation Results & Client Value Gain

Since it was put into operation in June 2023, ZAM-8 asphalt bag bitumen melting equipment has been running smoothly and continuously on the project site in Vietnam, perfectly solving various core pain points faced by customers in the early stage, realizing multiple value benefits of logistics cost reduction, construction efficiency improvement, asset preservation and compliance construction, forming a complete closed loop of project value:

Logistics Cost Reduction

The bitumen melting systems fully adapts to the international transportation standard of 40HQ containers, maximizes space utilization, and does not need to pay additional transportation costs. Compared with traditional non-standard melting equipment, it greatly reduces the comprehensive expenses of ocean logistics and effectively controls the initial investment cost of the project..

Bagged bitumen melter

Reusable Asset Improvement

Bolt-type detachable lifting brackets support rapid disassembly of bitumen bag decanter equipment and flexible transfer across construction sites. Customers can reuse equipment in multiple projects, completely eliminate the problem of idle waste of equipment, and significantly improve the utilization rate and long-term use value of fixed assets.

Stable Production Output

The high-capacity jumbo bag bitumen melting machine can continuously output 8-10 tons/hour for a long time and stabilize the melting capacity. The asphalt melting is uniform, the quality is uniform, and the performance is stable. It fully meets the needs of large-scale and continuous road construction, effectively guarantees the steady progress of the project period, and eliminates the delay of the project period and construction quality problems caused by insufficient production capacity.

Cost & Environmental Optimization

The efficient heat conduction heating system has lower energy consumption, effectively saving long-term operation energy consumption cost; simplifying manual operation process and reducing labor operation and maintenance cost; closed cavity structure greatly reduces asphalt volatilization and pollution emission, fully conforms to local environmental protection construction standards in Vietnam, and helps customers realize standardized, compliant and green construction.

Client Testimonial & Market Recognition

This Vietnam customer highly recognizes ZOOMLINE’s bitumen melter equipment quality, customized solution capability and overseas landing service system. According to the customer, the 40HQ standardized size design and bolt detachable modular structure exclusive to ZAM-8 decanter bitumen melting systems accurately overcome the industrial problems such as high ocean transportation cost, complicated construction site transfer and low equipment utilization rate, which have plagued enterprises for a long time. At the same time, the bag asphalt decanter system equipment has stable operation, high melting efficiency and low failure rate, which comprehensively improves the site construction efficiency and engineering quality, and provides a solid guarantee for the efficient landing of the project. It is a high-performance asphalt melting equipment highly suitable for overseas complex construction scenarios in Southeast Asia.

Call to Action

If your construction project is also faced with problems such as high cost of cross-border transportation of bitumen melting equipment, inconvenient site relocation, unstable melting capacity, and substandard construction environment, ZOOMLINE can provide you with one-to-one customized solutions. Our 8-10TPH bitumen melting machine for bagged bitumen, relying on the three core advantages of 40HQ standard cabinet design, detachable bolt bracket and efficient energy-saving heating system, perfectly adapts to various scenarios such as overseas ocean transportation, multi-site flexible transition and continuous mass production construction. If you need to know the detailed parameters of the equipment, customized solutions and factory direct quotations, please feel free to contact us!

 

ONLINE SERVICE
Your Satisfaction Is
Our Success
If you are looking for related products or have any other question, please feel free to contact us.
You can also give us a message below, We will contact you within 6 hours.
Contact Us
+86 18838114766

    Name

    *E-mail

    *Phone

    Company

    *Inquiry

    Inquire Now
    Tel: + 86 0371-65825035
    Whatsapp:+8618838114766
    weichat
    back top