ZOOMLINE MACHINERY
Whatsapp:
Language:
What we do
Burner
Burner is mainly used in asphalt mixing plant, boiler, dryer (such as brick kiln), metallurgy and other industries.
Get Price Quote
Contact Us
+86-18838114766
Burner
Coal Burner
ZOOMLINE coal burner is mainly used in asphalt mixing plant, boiler, dryer (such as brick kiln), metallurgy and other industries.
Plant Capacity:
15-400T/H
Motor Power:
16.95-254.95KW
Coal Consumption:
180-5600kg/h
Asphalt Temperature:
130-180℃
Send Email
Chat Now
Pulverized Coal Burner for Boiler
Pulverized Coal Burner for Boiler
Pulverized coal burner is the main combustion equipment of pulverized coal boiler.
Capacity:
4-40T Boiler
Fuel:
Pulverized coal
Coal Consumption:
50-4000kg/h
Output Power:
240-28000Kw
Send Email
Chat Now
Hot Air Generator
Hot Air Generator
TDR-M series coal-fired hot air generator is based on years of theory and practice of ZOOMLINE company, have been widely used in the drying, cement, powder and other fields.
Heating Capacity:
100x10⁴- 4500x10⁴KCal/h
Coal Consumption:
90-9500kg/h
Oil Consumption:
15-3000kg/h
Gas Consumption:
15-3200Nm³/h
Send Email
Chat Now
Oil And Gas Dual-use Burner
Oil And Gas Dual-use Burner
ZOOMLINE oil & gas dual-use burners are used in asphalt plants, boilers, dryers (such as brick kilns) and other industrial equipment.
Motor Power:
7-24.4MW
Max. Oil Consumption:
630-1800KG/H
Max. Gas Consumption:
680-1940NM3/H
Fuel:
Diesel/ Heavy oil/Natural gas
Send Email
Chat Now
Coal And Oil Dual-use Burner
Coal And Oil Dual-use Burner
ZOOMLINE coal-oil dual-purpose burner is mainly used in asphalt mixing plant, boiler, dryer (such as brick kiln), metallurgy and other industries.
Model:
MFR-S300NQ-MFR-S5000NQ
Motor Power:
960-35600KW
Coal Consumption:
150-5560kg/h
Oil Consumption:
86-3150kg/h
Send Email
Chat Now
Coal And Gas Dual-use Burner
Coal And Gas Dual-use Burner
The coal and gas dual-use burner is a new type of dual-fuel burner. The burner is widely used in boiler, drying and other fields.
Model:
MFR-S300G-MFR-S5000G
Motor Power:
960-35600kw
Coal Consumption:
150-5560kg/h
Gas Consumption:
96-3500Nm3/h
Send Email
Chat Now
What we do
20+Year Professional Manufacturer, Build Your Dream Road Together
Perfect after-sales service and all-round service network are the guarantee of ZOOMLINE to provide the quality services.
Get Price Quote
Contact Us
18838114766
Equipment Consultant Service
We offering the suggestions on constructions and recommend the suitable equipment for client.
Equipment Customization Service
We can customize design and process design for your project, and design and manufacture products according to your special needs.
Installation & Commissioning Service
Our engineers go to the client’s site to guide them to installation, debugging and training operators.
Remote Control System & Maintenance Service
Our engineers can diagnose the problem directly and offer an appropriate solution through the remote control system.
Spare Parts Supply Service
We guarantee the supply of original spare parts in the whole working life of the ZOOMLINE equipment.
7*24H Online Service
Whenever there is any accidental technical problem or need support, we are here and will reply within 6 hours.
Looking forward to working with you
Project of Burner
Burner is mainly used in asphalt mixing plant, boiler, dryer (such as brick kiln), metallurgy and other industries.
Online Services
Do you have any questions about our products?
You can always contact us through info@zoomline.biz or +86 18838114766 to get the support.
Contact Us Now
Looking forward to working with you
Question Answers
We believe that answers below will be vital and helpful for you starting your business. You will find quick answers to the most common questions here.
What payment terms are available for your company?
T/T (Telegraphic Transfer), L/C(Letter of credit), BG (bank guarantee), D/P(Documents against Payment), D/A((Documents against Acceptance), Western Union and other.
How long is needed for installation working of one set asphalt mixing plant?
20-30 working days for batch asphalt mixing plant, and 10-20 working days for continuous(drum) asphalt mixing plant.
How many person are needed for the operation of whole asphalt mixing plant ?
Six persons 
What’s your asphalt mixing plant model means ?
For example ZAP-S160: “ZAP” means ZOOMLINE Asphalt Plant, “S” means Stationary, “160” means the capacity of asphalt plant is 160TPH. “ZAP-S160” model mean ZOOMLINE stationary asphalt mixing plant with capacity of 160TPH. While “ZAP-M120” model mean ZOOMLINE mobile asphalt mixing plant with capacity of 120TPH.
How long is the service life of your asphalt mixing plant ?
Normally, the service life of our batch asphalt mixing plant is over 15 years, and it of our continuous (drum) asphalt mixing plant is over 10 years.
How about the quality guarantee period of your asphalt mixing plant ?
The guarantee period of our asphalt mixing plan is 15 months, we will bear the quality issue of all parts except wearing parts in guarantee period.
How about the spare parts supply of your company?
We will provide some wearing parts along with whole asphalt mixing plant to user freely, and user can purchase more wearing parts along with whole asphalt mixing plant.  We will keep the spare parts supply to user in the whole service life of asphalt mixing plant.
How about the after sales service of your company ?
We will send professional technical staff to user’s project working site to guide installing work, and commissioning the plant and training the operators of the buyer. And ZOOMLINE provide the technical support service to user’s within the whole service life of asphalt mixing plant.
Tel: + 86 0371-65825035
Tel: + 86 18838114766